One of the criteria required by ISO15189 and RDC302 is the traceability of inputs used in the pre-analytical phase.
The manual traceability control method is still widespread in the segment, however, we may face some difficulties and possible failures with this process, which can lead to a loss of credibility and trust.
The Greiner Bio-One eTrack was developed to carry out complete traceability of the inputs used in the collection, in an automatic, reliable and simple way.